Ensure the liquid supply is safe and stable, and the control is precise, meeting the normal production of the liquid injection machine.
Design Input

(1) Electrolyte dosage and storage period;

(2) Electrolyte category;

(3) Transmission distance and path;

(4)Electrolyte chemical characteristics.

Design Standards

(1) "Code for Fire Protection Design of Buildings" GB50016-2014 (2018 Edition);

(2) "Code for Design of Industrial Metal Pipes" GB50316-2000 (2008 Edition);

(3) "Code for Pressure Pipes - Industrial Pipes 》GB/T20801-2020;

(4) "Pressure Pipeline Safety Technical Supervision Regulations-Industrial Pipelines" TSGD0001-2009).

Design Output Condition

(1) Storage tank volume;

(2) Pipe material;

(3) Number of electrolyte transport pipeline groups;

(4) Electrolyte transport nitrogen pressure;

(5) Electrolyte leakage prevention measures;